
Flood Risk Management Plan for a Veterinary Clinic
In 2023, Living Water Engineering was engaged to prepare a Flood Risk Management Plan for a proposed veterinary clinic in Beecroft, NSW. As the site is flood-affected, the local Council required a Flood Risk Management Plan to identify potential flood risks and implement appropriate risk management measures.
To accurately assess on-site flood behaviour, our team developed a TUFLOW flood model to simulate flood conditions around the site. The model results were then validated against Council’s existing flood data, ensuring the accuracy and reliability of the assessment.
As part of the flood risk mitigation approach, our team determined the Flood Planning Level (FPL), which guided the establishment of the Finished Floor Level (FFL) for the proposed development. To enhance the site’s flood resilience, we recommended several key flood risk management measures, including:
- Incorporating flood-compatible materials in the building structure up to the FPL to minimise potential flood damage.
- Developing a Business FloodSafe Plan, outlining emergency procedures specific to the clinic’s operations.
A crucial component of the Flood Risk Management Plan was the development of a flood emergency response strategy, prioritising the safety of staff, clients, and animals during flood events. Our recommendations evaluated the feasibility of both sheltering-in-place and off-site evacuation, considering key factors such as flood depths, hazard classifications, and access constraints.
By leveraging advanced flood modelling and strategic risk management, Living Water Engineering delivered a comprehensive and practical flood resilience strategy for the proposed development. Our assessment ensured that the veterinary clinic met Council’s flood planning requirements while maintaining safety, operational continuity, and long-term flood resilience.